Step 1

Dig a trench for the ground where you are building the wall . Dig the trench at least double as wide as the breeze - blocks , and twice the height of the blocks , or below the frost pipeline , whichever is deeper . Your local zoning dining table can tell you how deep the frost line is in your country .

Step 2

Build a shape for the basis by driving wooden stakes into the ground a few inches inside each paries of the trench and nailing 2 - column inch by 4 - inch plug-in to them . Place a stage across the boards , and tap down the higher boards with a rubber mallet to take down them out , if necessary .

Step 3

grasp a small drainage trench next to the main deep . Add an inch of slope to the trench for every 20 feet of run ( duration ) .

Step 4

Step 5

Pour 2 column inch of low gravel into the bottom of the oceanic abyss and pack it down , then lay drain tile over the gravel . fulfill the oceanic abyss with crushed rock , insure the drain tile . Drain roofing tile is plastic piping that has yap reduce into it for drainage .

Step 6

Pour concrete into the form , filling it until it ’s above the top of the manikin . Depending on the size of it of the wall , you may require to hire a contractor who will rain cats and dogs the concrete from a truck .

Step 7

Slide a 2 - in by 4 - column inch board over the top of the shape to smooth the Earth’s surface of the concrete and expose spots where more concrete is want . add up concrete if necessary , and drag the board over the form again . Allow the concrete to set for at least four days .

Step 8

Step 9

transfer the wooden conformation from around the footing , and backfill the gap between the ground and the deep bulwark with dirt .

Step 10

labor three wooden stake around each quoin of the ground . Place one stake right away behind the corner and one stakes along the foothold 2 foot down from the nook . Nail 2 - inch by 4 - inch display board to the post along the top edge .

Step 11

Tie a string to the centre of one of the 2 - in by 4 - column inch boards , then take it down to the react 2 - in by 4 - column inch board on the next corner and tie it to the center . Do this on every corner . The point where the strings intersect indicate the footing ’s exact corner .

Step 12

Step 13

Lay the turning point blocks onto the footing so the stunned edges line up with the point where the strings intersect .

Step 14

office blocks onto the footing in between the corner blocks , keeping a 3/8 - inch break between each pulley-block to take the breadth of the trench mortar into account .

Step 15

Mark the outer edge of the blocks onto the terms , then remove the occlusion .

Step 16

Mix a batch of mortar , following the maker ’s didactics .

Step 17

Place the howitzer onto the footing in one of the corner with a trowel . utilize the mortar in a layer 1 inch deep , 8 inches wide and about three city block - length down the terms from the corner .

Step 18

Place the first corner pulley-block into the mortar , line it up so the verboten corners are aligned with the intersecting chain . lay a grade across the top of the block , and position the closure until it is even .

Step 19

Step 20

Apply trench mortar to the side of the first breeze - block and range it into the mortar next to the turning point block , keeping a 3/8 - inch gap between the block . Place the level across both block , and even them out if needed . go under blocks onto the footing where you have apply the trench mortar , then repeat this pace on the other side of the corner .

Step 21

Set the occlusion in the other corners using the same method acting .

Step 22

consist the pulley block on the terms between the corner blocks . Apply mortar to the terms as you go , keep a 3/8 - inch break between the blocks and check them for storey as you lie them . If you need to reduce any mental block to fit , tick the emasculated line on the block and cut it with a hammer and Freemasonry chisel .

Step 23

Step 24

lie the cube until the wall reaches the desired height , start in the street corner and working in towards the gist . Allow the mortar to set for the meter specified by the manufacturer .